Skip to content
View Patta
View Patta

Signed in

Your records

How to read an FMB sketch

· updated · 4 min read Records

Vignesh Nagarajan

Founder, Quiro Tech Solutions

An FMB sketch contains several kinds of numbers: a survey reference in the header, measurements beside line segments, and labels around the parcel. The Chettipatti specimen below has an irregular outline, so reading it as a rectangular plot would give a misleading area. Start with the header and follow each segment before comparing the drawing with your own documents.

Confirm the place before reading the outline

FMB specimen for Chettipatti survey 30/1A1 showing an irregular outline, area 1 hectare 82 ares and scale 1:1249

FMB specimen for Chettipatti [53], Kulathur taluk, Pudukkottai. The central parcel is labelled 1A1. The red and blue numerals are already on the source drawing; the readings below point to their positions.

The header gives Survey No: 30/1A1, Area: Hect 01 Ares 82.00, and Scale: 1:1249. The footer identifies the Survey and Settlement Department and prints an issue date of 21 September 2026, separately from the approval date.

This is a different parcel from the 181/5A2 patta specimen. A similar-looking document is not evidence about your plot. Match district, taluk, village and the full survey reference before comparing area or neighbours.

Follow the lines, rather than choosing four sides

The north arrow is above the drawing on the right. The upper edge has several bends, with visible segment labels 37.2, 8.0, 67.4, 37.6 and 23.4. The label 24 is printed beyond the long upper segment. Along the lower part, visible segment labels include 50.8, 32.6 and 57.4, with 212 printed below.

The right edge is divided into shorter segments beside labels 1B1, 1C1, 1D, 1E, 1F, 1G and 1H. Measurements such as 13.6, 15.2, 16.2 and 18.4 sit along that segmented edge. They do not describe one single straight side. Point numerals and parcel labels also appear, so copying every number as a length would mix different information.

Use those positions as a reading aid, not a reconstruction of the survey. If a label is unclear on your copy, obtain a readable source copy or ask the survey office to interpret it. The diagram does not name every possible neighbour in a four-row north/east/south/west list.

Read the printed area separately from the scale

1 hectare and 82 ares equals 18,200 square metres. The header supplies that recorded area. The scale 1:1249 supplies a drawing ratio; it is not the area and does not mean the image will remain at that scale after a browser or printer resizes it.

This outline is not a rectangle. Multiplying two selected edge labels cannot check its area. A survey calculation would need the relevant geometry and measurement information, not just the longest horizontal and vertical lines visible in a screenshot. See hectares and ares to convert the units without changing the recorded value.

Whole survey and subdivision are different requests

In View Patta’s FMB lookup, a subdivision is optional. Leave it blank to request the whole survey; enter the subdivision to request that part. A blank is not an instruction to invent a subdivision of 0.

The source can have a subdivision drawing without a whole-survey drawing, or the reverse. A result saying that the whole-survey sketch is unavailable applies to that scope; it is not proof that all subdivisions are unavailable. Use the exact scope in your document. If the result names a missing subdivision sketch, selecting a different subdivision would describe different land, not repair the first request.

Compare documents and ground observations carefully

Put the sketch beside the property schedule in your sale deed, patta and A-Register. Write down disagreements in the identifiers, extent or adjoining references. A wall visible today and a line on a drawing are separate observations; a visual walk alone cannot establish that they occupy the same surveyed position.

The official e-Services help describes FMB as a diagram of land in rural areas. For a town-survey reference, use the TSLR sketch and its ward/block identifiers. For an unresolved physical boundary, ask the survey office what survey is needed. For disputed rights, take qualified legal advice before relying on the outline.

A sketch explains recorded geometry. It does not identify the owner or clear the transaction history; those questions require different documents, including the EC. View Patta offers checkout only after a complete record is prepared. A missing sketch produces no quote or charge.

Common questions

Is the FMB specimen for the same parcel as the patta sample?
No. This FMB is for Chettipatti, Kulathur taluk, Pudukkottai, survey 30/1A1. The patta sample is for Ayyappan Thangal survey 181/5A2. They illustrate different records and must not be compared as one property.
Can I calculate this area by multiplying two edge lengths?
No. This outline has several bends and segmented edges. The header states 1 hectare and 82 ares; multiplying two visible lengths would treat the irregular parcel as a rectangle.
What does a blank subdivision mean in View Patta?
For the FMB sketch lookup, leaving the optional subdivision blank requests the whole survey. Supplying a subdivision requests that subdivision instead. These are separate scopes.
Does a sketch settle a boundary dispute?
The diagram supplies recorded geometry to compare with your documents and a survey. It cannot establish present possession, locate every ground marker or resolve disputed rights on its own.

View Patta is not a government website and is not affiliated with any government body.

Ready when you are

Find your land record.

Search by district or record type. Choose your village in the record search. No record, no charge: if we can't deliver it, your money stays yours.

Search records

Login or Sign up

We use this number only to find your records and keep a fetched document available for 180 days.

+91

10 digits, no leading zero.

By proceeding you acknowledge that you have read, understood and agree to our Terms of Service and Privacy Policy .

Feedback

Tell us what's working and what isn't. It goes straight to the team.